Uploaded image for project: 'OSCAR'
  1. OSCAR
  2. OS-8480

PPL SPA - Creation of the Project Entry & Maintenance Screen

Insert Lucidchart DiagramSend email
    XporterXMLWordPrintable

Details

    • Story
    • Resolution: Completed
    • Medium
    • 7.1
    • None
    • CM
    • None

    Description

      Problem Statement

      In the main screen, the PPL need to be able to access the project they manage and execute 4 types of actions: create a new entry, edit an entry, delete an entry, access the summary dashboard

      Screen is divided into 5 sections:

      • main tracker at the top, to help navigate / consult projects
      • main tracker section host the NEW / EDIT / DELETE buttons
      • main tracker has a selection of key fields to show (not all fields are shown)

      The other sections are project specific

      • project header
      • project attributes
      • Impacted sites & products
      • Project Milestones
      • Finance and Resourcing

      UI framework below can be followed to replicate the look & feel (enclosed pictures)

      IMPORTANT UI UPDATE

      The project specific section would be accessed via TAB navigation to try to keep it all in one screen without scrolling down,   rather than collapsible panels in current design. (List of tabs and corresponding fields is enclosed). PLease see additional PPT file and Excel file to explain how the UI should now look like compared to initial Figma version.

      ▶ Page 1 - PPL SPA Tool (figma.com)

       

      Acceptance Criteria

      • Follow guidance enclosed in the ppt design document
      • Each section are created with the required corresponding fields
      • Edit capabilities are only granted to BSL/PPL users

       

       

      Attachments

        Issue Links

          Activity

            People

              MANIAA04 Maniapillai, Arun
              ESPAGJ Espagnet, Julien
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved:

                Time Tracking

                  Estimated:
                  Original Estimate - 10 weeks, 4 days
                  10w 4d
                  Remaining:
                  Time Spent - 3 days, 4 hours Remaining Estimate - 1 day, 2 hours
                  1d 2h
                  Logged:
                  Time Spent - 3 days, 4 hours Remaining Estimate - 1 day, 2 hours Time Not Required
                  3d 4h