    Description

      Problems Statement: 

      1. AW- Display PAR information according to the correct PAR field name – Moved logistics change reason data to Brief description or comment column(Logistics change reason & Packaging Instructions will be filled after database is updated)
      2. AW-Artwork progress data is now rely on the PCM ID, but user may not create PCM ID for all PAR, so it is requested to update the logic & pull data from BOBJ/ePALM instead and the logic of the calculation should still be the same as PCM tool 
      3. AW-First batch information is missing when it is not maintain in ePALM
      4. AW/NTS - Exclude the virtual PAR , i.e. any PAR with %virtual% in plant column
      5. NTS-PAR/ DOM/DOE information are missing in NTS report.
      6. NTS- PAR condition should be the same as AW i.e. status with "APPROVED" "IN PROGRESS" "CLOSED" & request type with "CHANGE" "NEW" "NON ARTWORK CHANGE" 

      Acceptance criteria:

      1. AW-Display the data of "Logistics change reason" ; 'Brief description or comment" & "Packaging Instructions" correctly
      2. AW-Artwork progress data work even without PCM ID
      3. AW-First batch information should refer to the BOBJ report instead of ePALM
      4. AW/NTS-Exclude the virtual PAR.
      5. Show complete information in NTS report. each line should have PAR number (even planned order should be able to find the corresponding PAR#) , and order with batch number should have DOM/DOE. If more than 1 PAR# applied for a batch, NTS should show the latest PAR number. (refer to Lourdes' email)
      6. the PAR shown in NTS report should apply  the same conditions as AW .

      Attachments

        Issue Links

          Activity

            People

              BABUP07 Babu, Pavithran
              LUKM01 Luk, Mavis
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

                Created:
                Updated:

                Time Tracking

                  Estimated:
                  Original Estimate - 3 days
                  3d
                  Remaining:
                  Remaining Estimate - 0 minutes
                  0m
                  Logged:
                  Time Spent - 3 days