Description
As a production planner, I need the ability to create/edit shipments manually in SIQ.
Create/edit shipment in SIQ. As a production planner, I need the ability to create/edit shipments manually in SIQ. For exceptional scenario system is unable to close the shipment. Its time consuming in current system as its manual process. Need to enable this in user interface.
rationale : Time consuming and Shipments hanging to close the orders and impacting the business.
benefit : Exceptional scenario will be handled and more tickets need not require to create by the user.
So What, if deferred?
What is the consequence if this change cannot be supported and must be deferred?
1. There will be dependencies on support team to fix it
2. Until the shipment will be updated the order status will be open which gives incorrect order status.
List of actions:
- Create shipment
- Edit Shipment
- Flag as partial
- Flag as final
- Update status (Ready To Ship, In Transit, Received)
- Cancel TLB
qTest: Test Execution
Attachments
Issue Links
- parent
-
OS-21468 DB task : Cancel TLB - change OS 20701
- Closed
- links to
-
TC-4192 001_Open Order_Verify that user able to see the Cancel TLB button enabled for the already TLB existing Order in the Manage Shipment screen
-
TC-4193 002_PartShip Order_Verify that user able to see the Cancel TLB button enabled for the already TLB existing Order in the Manage Shipment screen
-
TC-4194 003_STD Scenario_Open Order_Verify that user able to Cancel one Shipment with Balance Qty is updated accordingly and the Cancelled TLB deleted in the Net Req AG Grid
-
TC-4195 004_ES2O Scenario_Open Order_Verify that user able to Cancel one Shipment with Balance Qty is updated accordingly and the Cancelled TLB deleted in the Net Req AG Grid
-
TC-4196 005_ES Scenario_Open Order_Verify that user able to Cancel one Shipment with Balance Qty is updated accordingly and the Cancelled TLB deleted in the Net Req AG Grid
-
TC-4197 006_STD Scenario_PartShip Order_Verify that user able to Cancel one Shipment with Balance Qty is updated accordingly and the Cancelled TLB deleted in the Net Req AG Grid
-
TC-4198 007_ES2O Scenario_PartShip Order_Verify that user able to Cancel one Shipment with Balance Qty is updated accordingly and the Cancelled TLB deleted in the Net Req AG Grid
-
TC-4199 008_ES Scenario_PartShip Order_Verify that user able to Cancel one Shipment with Balance Qty is updated accordingly and the Cancelled TLB deleted in the Net Req AG Grid
-
TC-4200 009_Open Order_Verify that user able to see the other Shipments in the AG Grid and Manage Shipment other than the Cancelled TLB with the same Shipment Indicators
-
TC-4201 010_PartShip Order_Verify that user able to see the other Shipments in the AG Grid and Manage Shipment other than the Cancelled TLB with the same Shipment Indicators
-
TC-4202 011_Open Order_Verify that user able to access other action in Manage Shipment screen after Cancelling TLB
-
TC-4203 012_PartShip Order_Verify that user able to access other action in Manage Shipment screen after Cancelling TLB
-
TC-4204 013_Verify that user is unable to see the Cancel TLB button for the Shipment status In Transit