Details
-
Bug
-
Resolution: Completed
-
High
-
None
-
None
-
S2O Sprint 4, S2O Sprint 5
-
converted to task
-
Others
-
Description
Steps to reproduce:
- Login to the S2O page
- Enter a Material code and click on Filter
- Select the SKU displayed in the Alter overview
- The selected SKU is visible in the PIR grid, click on the SKU
- Then go to the Edit toggle button.
- The button is enabled, click on the button
- Do not enter the Need By Date and Enter the Order Qty and hit on Enter once
- Save changes button is displayed, now click on it.
- Observe the result
Expected result:
User should not able to create the PO record without date
Actual Result:
User is able to see the create PO record but there is 'Need by Date column has values as 'undefined'
Cosmetic issues:
1)when we double click on date picker and close the calendar then it is displaying test as 'undefined'
2)After selecting date picker the box is not closed properly
3)After created P order, if user try to edit the quantity the Calendar is also getting displayed.
Attachments
Issue Links
- blocks
-
OS-11234 UI - Net Requirements
- Closed
- clones
-
OS-12502 [UI Feature] NetReq # number is not getting generated for the created Planned Order for the selected SKU
- Done
- is blocked by
-
OS-11532 Logic UI - Net Requirement Validation
- Closed
- is cloned by
-
OS-13128 Dev -[UI Feature] -Filter of S2OSource in S2O Alert Overview table is not displaying
- Done