Uploaded image for project: 'OSCAR'
  1. OSCAR
  2. OS-21662

TC EXEC - AFW - Stakeholder Rename and Mapping Pop-Up

Insert Lucidchart DiagramSend email
    XporterXMLWordPrintable

Details

    • Task
    • Resolution: Unresolved
    • High
    • None
    • None
    • AE
    • AE Sprint 148
    • Non-GxP
    • A

    Description

      1. Rename the existing Global AFW roles as below  -

      a.    PGS Site Leader – L2 - Threshold greater than $2M
      b.    PGS Site Finance Lead – L2 - Threshold greater than $2M
      c.    PGS OPU Lead – L0 - Threshold 0 to $2M
      d.    PGS Sub OPU Finance Lead -L0 – Threshold 0 to $2M

        • Add a button: “PGS Approvers: -> if site doesn’t exist yet, select the site’s name from dropdown (multiple choices), else take the site from the AFW. Then the system will display below table with the details of the site and the thresholds (refer to the sheer shared by Paul)
          Sites Threshold Lower Upper Approver 1 Approver 2
          Algete 0 250k PGS Site Finance lead PGS Site leader
          Algete 251k - PGS Sub Opu Finance lead PGS Opu Operations lead

      Attachments

        Issue Links

          Activity

            People

              SRINIK18 Srinivasan, Kowsalya
              GUPTAK36 Gupta, Kshitiz
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

                Created:
                Updated:

                Time Tracking

                  Estimated:
                  Original Estimate - 4 days
                  4d
                  Remaining:
                  Remaining Estimate - 2 hours
                  2h
                  Logged:
                  Time Spent - Not Specified Time Not Required
                  Not Specified