SP to recalculate all Start/End Date based on user input

Insert Lucidchart DiagramSend email
    XporterXMLWordPrintable

Details

    • Task
    • Resolution: Unresolved
    • Medium
    • None
    • None
    • NPL
    • None

    Description

      Problem Statement

      Based on the frozen list of activity and automatically generated standard timeline, PMO willl have a starting point that they can choose to continue using as is, or decide to start to make some amendment to the step they think will deviate from the generated timeline.

      When wanting to make changes, the PMO will need to ability to change a step Start Date and/or a step End Date. Both start dates and end states could be moved both ways, being advanced or delayed.

      The impact of such change will reflect in a live fashion on the Gantt chart.

      Please see below illustration

       

      Acceptance Criteria

      • Start Date and End Date for each step is editable by the PMO
      • Change can be done by either direct input to the field / cell or through a date picker
      • Date format used is DD-MMM-YY (ex: 23-Jan-2024)
      • When a date is modified, the "black dots" representing the start and end of the step are moving accordingly in the gantt chart, the coloring of the background also adjust accordingly
      • Once a date is modified and does not correspond to an exact date from the weekly buckets start date, the dots would reflect in the weekly bucket the date belongs to (ex: if a task end date is 04Sep24, it would be plotted against the 02Sep24 weekly bucket)
      • In the event that the PMO modifies a step "End Date", the recalculation needs to take place for the cascading steps (based on the rule that the end date of a step is the start date of the next step)

       

      Illustration

       

      Attachments

        Issue Links

          Activity

            People

              MAHESP13 Mahesh Gundekar, Pallavi
              ESPAGJ Espagnet, Julien
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

                Created:
                Updated:

                Time Tracking

                  Estimated:
                  Original Estimate - 2 days
                  2d
                  Remaining:
                  Remaining Estimate - 2 days
                  2d
                  Logged:
                  Time Spent - Not Specified
                  Not Specified