PCM - NPL Event - Bring in "Market Receipt Date" and "Market Release Date" as 2 new read only fields in Date Section

Insert Lucidchart DiagramSend email
    XporterXMLWordPrintable

Details

    • Task
    • Resolution: Completed
    • High
    • 10.0
    • None
    • AE

    Description

      Problem Statement

      For the NPL PCM events, leadership is after establishing lead time measurements in order to accelerate the delivery to market. Currently PCM misses 2 key milestones that are required for the lead time measurement:

      • Ship Date from plant or LC (logic for location and movement type to be confirmed....maybe consult with squad who worked on last mile?)
      • Receipt Date at market (reading the SAP ECC material movement history and fetching the first ever "101" goods receipts movement type in the market for the required SAP code)
      • Release Date at market (reading the SAP ECC material movement history and fetching the first ever "321" release movement type in the market for the required SAP code)

      We would like to have those 2 milestones included in the PCM Date section screen (as per included screenshot)

      Potential UDH table to utilize could be PGSUDH_DL_PROD.PGSUDH_CDM.ECC_MATERIAL_MOVEMENTS

      Acceptance Criteria

      • For NPL PCM incidents, the 3 new date miletones are available as read only field (fetched from material movement for SAP Code, Mkt location and movement types 101 for receipt, 321 for release)
      • Dates are to be picked up for the 1st batch ever shipped, receipted and released at the market (not the subsequent one)
      • Data is to be fetched daily the moment the SAP code is documented, until the dates are captured...
      • Fields are included on the screen as per enclosed screenhot
      • Those 3 new fields are only visible for NPL event types
      • Those 3 fields are reflected in the PCM excel reports and tableau PCM databases (PCM and NPL ones)

       

      Attachments

        Issue Links

          Activity

            People

              VENKAV30 Venkata Syamala, Vijayalakshmi
              ESPAGJ Espagnet, Julien
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved:

                Time Tracking

                  Estimated:
                  Original Estimate - 2 days
                  2d
                  Remaining:
                  Remaining Estimate - 0 minutes
                  0m
                  Logged:
                  Time Spent - 2 days
                  2d