Description
Tony: Required front-end code change for user's override of TRSL. Need to re-assign to SR's full stack engineer
Problem Statement,
While the TRSL engine has algorithm to work out the best possible TRSL based on 5 rules, it has been oberserved that the best TRSL was not always selected. We would like to continue having the TRSL run its algorithm and assign the most probable value, but also allow the user :
- either select the value generated by another rule (not specifically the selected one)
- or fully override the TRSL value
In the enclosed example....the assigned TRSL is 115 days, users would have like to be able to utilise the population mean of 438 days or the sample mean of 530 days instead....assing directly another value
Acceptance Criteria
- enhance the TRSL logic table by inluding tick boxes on every row to allow user to ingore the assigned value and utilize another one
- enhance the TRSL logic table with another row to allow the user entry of a different value for TRSL
- user selection of a different value is taken into account for the wo wastage calculation, over the auto assigned value
- if user has overriden the suggested TRSL in any way (selecting or documenting), the Stop Sale Date cell for the Supply IQ batches is circled in color to indicate the override
qTest: Test Execution
Attachments
Issue Links
- clones
-
OS-16611 WO - Part 1 - Enable the TRSL analysis tool to allow the user to select the rule applied or override the TRSL - UI
- Closed