Jira tracks issues, which can be bugs, feature requests, or any other tasks you want to track.

Each issue has a variety of associated information including:

  • the issue type
  • a summary
  • a description of the issue
  • the project which the issue belongs to
  • components within a project which are associated with this issue
  • versions of the project which are affected by this issue
  • versions of the project which will resolve the issue
  • the environment in which it occurs
  • a priority for being fixed
  • an assigned developer to work on the task
  • a reporter - the user who entered the issue into the system
  • the current status of the issue
  • a full history log of all field changes that have occurred
  • a comment trail added by users
  • if the issue is resolved - the resolution

Issue Types

Jira can be used to track many different types of issues. The currently defined issue types are listed below. In addition, you can add more in the administration section.

For Regular Issues
Consulting Project
Project Trackers
Patch Assessment
Used for the VPA project
Firewall Rules
System Team
DT-System Team
Data Onboarding
Request
Off Board
End of Service Life
Documentation
Advocacy Org
User Request
System Test
System Test
Theme
Delay Item
Delay Item
New
New Request
Release to Test
Release To Prod
Qualification
New Request
Hardware
Telecom
Software
Generic Story
Generic Bug
Validation
Upgrade
Continuous Improvement
Case
CACG-JIRA : Audit case type
Event Analysis/NIPS Metric Discussion
Content Review
Service Request
Development
Project
Vulnerability Scan Request
Retest
Facilities Service Request
Testing Task
Used for tasks that require testing only. Will follow a different workflow than regular Tasks.
DAX Service Request
NOT USED AS OF APRIL 2019 - Used for recording service requests related to DAX
Scientific IT Service Request
NOT USED AS OF APRIL 2019 - Used for filing Scientific Support IT requests
Data Extract
Used for tracking data extract, transformation, & loading tasks required for project implementations
ACR
Support Task
Support Task
Solution Owner Task
Solution Owner Task
UC Enhancement
UC Enhancement
Vulnerability/Exploit Review & Detections
Exclusion
Feature
Feature issue type added for Template 2 (Migrated on 2 Feb 2022 14:54 UTC)
Workspace Request
Used to support Workspace change requests submitted by customers
IT Audit
Used for IT internal and SOx required audit tickets
PFE Exception Request
Used for processing Pfizer exception requests originating from Legacy Array during the transition
ECMR
CCR
WO
Field-ACR
Research
Design
Endpoint Protection
Onboarding Request
Red Team
MITRE ATT&CK Framework
Exception
Deviation
Adhoc Report
End of Study
Project KBA ADD CHG Parent
CIoC
Continuous Improvement of Content
ASF Add
ASF Change
General Request
Project KBA ADD CHG Child
Project KBA Trans Child
Project KBA Trans Parent
KBA Add or Change
Standard
Ad-Hoc
Common Core
LightSpeed
Functional
Self-Service: Data Onboarding
Project Tracking
Project Work
Ramp Down
Change Notification
Assessment
Work Order
Code Transfer
Code Change
PLC ACR
Resource Request
Requirement
Requirement (Migrated on 2 Feb 2022 14:54 UTC)
Fault
Track system outages or incidents. Created by JIRA Service Desk.
Access
For new system accounts or passwords. Created by JIRA Service Desk.
Purchase
Track items that need to be bought. Created by JIRA Service Desk.
Requirements
Demand
Security Validation Test
Security Validation Test
Alert Review
Alert Review
Use Case
Custom issue type created to track automation initiatives across all towers
GBI ATM Project Provisioning - BOBJ
GBI ATM Project Provisioning - BOBJ
ATP Project Provisioning - Tableau
This is project provisioning for for Tableau
ATP Project Provisioning - (VAW 2.0)
this is project provisioning form for Virtual Analytics Workbench (VAW 2.0)
ATP Project Provisioning - Informatica
This is project provisioning form for Informatica
User Story
GBI -- Bug
A bug to a GBI service and/or solution
Internal Task
This is type of issue to be used internally (created for BAI AES SD)
GBI -- Maintenance
Change required to maintain system
GBI -- Change Request
GBI -- Continual Improvement
GBI -- Project
Project Specific Change
CBT - Project related
CBT Minor enhancement
BAU Change
Product-Enhancement
CBT Major enhancement
Product-Bug Fix
Config-Enhancement
CBT ENHANCEMENT
CBT Bug fix
CBT ANALYSIS
Config-Bug Fix
Comment/Feedback
LATAM -- Change Request
LATAM - Bug
LATAM - Continual Improvement
LATAM - Maintenance
Milestone
Question
For General Tracker
AES Data Load Request
Special data load request
Redshift Access Request Form
Change Proposal
Request for Access
GBI CCS Request for Access
Email
Request coming through an email.
Environment Change Request
Change request for all Environment changes.
BAU Task
For BAI AES Service Desk
Notification
Bug fix
Support bug fixes report will be used in support service desk
Detection
Validation Request
Detection Tuning
Enhancement
Code deliverable requirement that implements a change or improvement to an existing feature. Use for enhancement projects. (Migrated on 2 Feb 2022 14:54 UTC)
Bug
A problem or error.
Minor Enhancement
Issue worth noting but small
Epic
Created by Jira Software - do not edit or delete. Issue type for a big user story that needs to be broken down.
Story
Created by Jira Software - do not edit or delete. Issue type for a user story.
Defect
Activity
Tasks associated with programs
LT
Long Term Project
Portfolio Program
Enhancement Request
Action Item
DT-Action Item
Initiative
(Migrated on 2 Feb 2022 14:54 UTC)
Software Request
Software Request issues for HPC
UX Design
DT-UX Design
Release Plan
DT Release Plan
Full Onboard
TTO Onboard
Identity Verification
Spike
R&D, Research, In-Sprint Time requiring analysis (Migrated on 2 Feb 2022 14:54 UTC)
Enabler
DT-Enabler
Asset
GBI Asset Type
Enterprise Enhancement
Report
Rules and Alerting
Device Evaluation
Device Evaluation
Vendor Evaluation
Remediation Task
Tool
URG
Alert
To be used by CSTR for content and detection
Signature
To be used by CSTR for content and detection
Risk
These are risks to the projcect (Migrated on 2 Feb 2022 14:54 UTC)
Issue
A general, non-catorgorized issue. (Migrated on 2 Feb 2022 14:54 UTC)
Decision
This is a decision that has been made during the activities of the project. (Migrated on 2 Feb 2022 14:54 UTC)
Dependencies
(Migrated on 2 Feb 2022 14:54 UTC)
Feedback
Feedback
Impediment
Issue type to capture blockers/obstacles in your project (Migrated on 2 Feb 2022 14:54 UTC)
Product/Project
Customer
Goal
Realignment
CAB Meeting Notes
Test Case
(Migrated on 2 Feb 2022 14:54 UTC)
On boarding
Off boarding
Bug fixes
Support bug fixes report will be used in support service desk
UAT Finding
UAT Finding standard issue type created for digital projects (Migrated on 2 Feb 2022 14:54 UTC)
Testing
Analysis
Deployment
App Publish
IT for IT
Original Type
Original Type
N/A
Risks
Decisions
Change-Request
Retirement
Category Change
Pfizer Enhancement
Emergency Change
Omniture Request
Omniture request -- will be used by support service desk
Platform
Platform related request for support service desk
BugBug806
System
Vendor
ObservationTracker
Escalations
Document
Third Party A&P Review
Engagement Request
Engagement Request
Support Request
(Migrated on 2 Feb 2022 15:14 UTC)
Developer Task
(Migrated on 2 Feb 2022 15:14 UTC)
Test Cases
(Migrated on 2 Feb 2022 14:54 UTC)
Deviation Request
RFC
DQ
Delivery Mechanism
Section
Issue Type Section is added in template 2 (Migrated on 2 Feb 2022 14:54 UTC)
Clarification
(Migrated on 2 Feb 2022 14:54 UTC)
Actions
(Migrated on 2 Feb 2022 14:54 UTC)
Feedback
(Migrated on 2 Feb 2022 14:54 UTC)
Configuration
(Migrated on 2 Feb 2022 14:54 UTC)
Legacy Issues
(Migrated on 2 Feb 2022 14:54 UTC)
Maintenance Bug
Code deliverable requirement that implements a fix to an identified defect or issue. Use for Managed Services Issues. (Migrated on 2 Feb 2022 14:54 UTC)
Maintenance Task
Code deliverable requirement that implements a change, task, security, or other critical issue raised for managed services team. Use for Managed Services Tasks. (Migrated on 2 Feb 2022 14:54 UTC)
Demand Management
MinorEnhancement
Veeva Roadmap Enhancement
Data Fix
Adhoc Export
Adhoc Export
Administrative
Administrative
Report Excursion
CTI: External Analysis Request
CTI: Monitoring
CTI
Engagement
Trino Datasets Onboarding
Approval
S-Project
Impact Assessment
Compliance Requirement
Message Broker
Feature Request
Activities
IMP: Scrum issue Type Scheme1
Access for Service Account
Application Hosting Request
Access to the Subscription API
New OAuth2 Account for Atlas Cloud API
Prerequisite
Artifact Tracker
Blocker
Issue Tracker
Releases
SM APEX
SM General
Project Libra
SM Category paths
SM Request Mgmt
SM DD MSAP
AM Asset Manager
Bugfix Maintenance
Hypercare
Defects and Feed back
Go Live Tracker
XMatters
Mercury Part2
SM SLAs And OLAs
SM KM Right Answers
SM Problem Mgmt
SM Config Mgmt
UCMDB
SM Incident Mgmt
SM AT&T Ebonding
Network Request
DSR Tracker
Portfolio Epic
Program Epic
Deployment Check List
Key_Result
Hacker One Remediation Task
Change Requests
3PC - Consulting
SM Change Mgmt
Design Tracker
Build Tracker
Epic (Credentials)
In-Release Bugs
Patch
Solution Requirements
MM V2.0 Defect
MM V2.1 Artifact
Backlog
Cat Path Editor
BTSM App Editor
InfoCenter
BTSM Contact Reassignment
Patch On Demand
BTSM Survey
BTSM Web Portal
BTSM Web Services
CI Viz
BTSM Data Quality
BTSM ARC
MyTickets
SM Account Request Tool
ATF Issue
PTMF Manual Create
PTMF Email
Insight
Hypothesis
Report Issue
Report Creation or Change
Data Analytics Request
DLSM
SM Tickets
Story - Credentials
Minor CAB
Major CAB
RFC - Atlas
Leading Indicator
Remediation ACR
Field ACR
LATAM -- DevOps Change Request
Global Change Request (GCR)
Local Change Request (LCR)
Service Request (SR)
Informal Defect
Defect with no qTest and VERA integration
Data Onboarding request in PGS UDH
Request deployment
Transport
Milestones
Release Plan milestones
ORR
Inspections
Action Plans
SRA
BRAM
Metrics
CMS
BCM
JHA
Cority Safety
Inseer
Audits
SRV
Data Mart
AptixAR
WERCS
Compound Profile
OES
Tesr
Tenable False Positive Review
ePTW
DREQ
PREQ
ALG
IV
Intake
Implementation
SOP Enhancement
Threat Remediation Request
Colleague Resource Management
Patching
UAT Test
Dependency
Supplier Security Assessment
Security Questionnaire
Risk Recon
Employee Demographics
Safety
QA Bug
SIT bug
UAT bug
Occupational Health
Occupational Hygiene
BEC - Consulting
Tenable Remediation Task
Impediments
Contract
Story - 3rd Party Review
Process Improvement
Business Case
External Dependency
Testing Defect
Questionaire for Airflow
PTMF Packet Only
Issue template (WBSGantt)
Issue template
Test
This Issue Type is used to create Zephyr Test within Jira.
Incident
For system outages or incidents. Created by JIRA Service Desk.
Change
Created by JIRA Service Desk.
Problem
Track underlying causes of incidents. Created by JIRA Service Desk.
Task
A small, distinct piece of work.
IT Help
For general IT problems and questions.
Service Request
This will be used to make any configuration changes in the cluster
Service Request with Approvals
For requests that require approval. Created by JIRA Service Desk
Support
For customer support issues. Created by JIRA Service Desk.
Improvement
An improvement or enhancement to an existing feature or task.
New Feature
A new feature of the product, which has yet to be developed.
For Sub-Task Issues
Bug Sub-Task
Sub-task
A small piece of work that's part of a larger task.
QMS09
A Vendor/ARO Assessment
Configuration Management
Create Master and Deployment CI Record in CMDB
Change Request
Release Plan Sub Task
DT-Release Plan Sub Task
Attack and Penetration Testing
Pfire Lab Device Evaluation Attack and Penetration Testing
Remediation Subtask
Subtask used for the PANSEW Project
Test Run
Solution Requirement
Query
For the new Pfizer Standard Project Structure - Internal Demo project (Migrated on 2 Feb 2022 14:54 UTC)
User Requirement
Strategic Initiative
Observation
SQE
Finding
Inspection Readiness
2nd Check
UAT Finding V2
UAT Finding V2 as subtask created for digital project (Migrated on 2 Feb 2022 14:54 UTC)
Maintenance Sub-Task
Broken down task of a larger issue type. Use where several tasks are required to complete the issue type. Use for Managed Services. (Migrated on 2 Feb 2022 14:54 UTC)
Sub-Bug
(Migrated on 2 Feb 2022 14:54 UTC)
Security Validation Action
Sub-test
Action
Inquiry
Depend On
SCA
Vendor Assessment
Security Assessment
Vendor Controls - Security Assessment
Compliance and Risk Assessment
Vendor Controls - Risk Profile
SMD Assessment
Software Medical Device Assessment
Promotion

Priority Levels

An issue has a priority level which indicates its importance. The currently defined priorities are listed below. In addition, you can add more priority levels in the administration section.

Critical
Highest
This problem will block progress.
High
Serious problem that could block progress.
Medium
Has the potential to affect progress.
Low
Minor problem or easily worked around.
Lowest
Trivial problem with little or no impact on progress.
Normal
Request with default priority
Blocker
The problem will block progress.
Minor
Trivial problem with little or no impact on progress.
Trivial
Trivial problem with little or no impact on progress.
Not yet set
Major
Major loss of function.
ASAP
Needs to be done ASAP
None
Very High
Expedite
Standard
Intangible
Fixed Date
Informational
53
Created by JIM during import process
4-Critical/Emergency
Created by JIM during import process
High Medium
Created by JIM during import process
High Low
Created by JIM during import process
Medium Low
Created by JIM during import process
2-Medium
Created by JIM during import process
High Critical/Emergency
Created by JIM during import process
3-High
Created by JIM during import process
Med
Created by JIM during import process
Very Low

Statuses

Status Categories

Helps identify where an issue is in its lifecycle.
Issues move from To Do to In Progress when work starts on them, and later move to Done when all work is complete.

Done

Represents anything for which work has been completed

In Progress

Represents anything in the process of being worked on

No Category

A category is yet to be set for this status

To Do

Represents anything new

Issue Statuses

Each issue has a status, which indicates the stage of the issue. In the default workflow, issues start as being Open, progressing to In Progress, Resolved and then Closed. Other workflows may have other status transitions.

Yet to start
In Progress
This issue is being actively worked on at the moment by the assignee.
Reopened
This issue was once resolved, but the resolution was deemed incorrect. From here issues are either marked assigned or resolved.
Resolved
A resolution has been taken, and it is awaiting verification by reporter. From here issues are either reopened, or are closed.
To-Do
Done
Kicked Off Dev / Documentation
Desk Check
Development, BCD Documentation, RSV Documentation Complete. Review work to move forward.
Testing In Progress
BCDV and RSV for applicable sections
PO Review
This status is managed internally by Jira Software
Not Started
Selected for Development/Documentation
Under Review
Approved
Cancelled
(Migrated on 2 Feb 2022 14:54 UTC)
Rejected
Waiting
This status is managed internally by JIRA Software
Pre-ESD
GST Stages
ESD
GST Stages
SDS
GST Stages
LD
GST Stages
Pre-clinical
GST Stages
Phase I
GST Stages
Phase II
GST Stages
Phase III
GST Stages
Terminate Development
GST Stages
In Review
This status is managed internally by JIRA Software (Migrated on 2 Feb 2022 14:54 UTC)
Unit Test/BCDV/RSV Execution
Showcase
Recently Started
Review in Progress
UC-Approved, Pending LT Approval
Approved - Add to Backlog
Team Review
Determine if this is a true defect.
Solution Assessment
Technical Team to come up with a solution for the defect
Impact Assessment
Assessment in progress
Ready for Dev
Business Approval Needed
Draft
To be Reviewed
Work in Progress - SBX
Formal Testing
Task Complete (Non-Prod)
PRODUCTION
Ready to be promoted to PROD
Verified
This status is managed internally by JIRA Software
Declined
This was auto-generated by JIRA Service Desk during workflow import
Waiting for support
This was auto-generated by JIRA Service Desk during workflow import
Waiting for customer
This was auto-generated by JIRA Service Desk during workflow import
Pending
(Migrated on 2 Feb 2022 15:13 UTC)
Canceled
Change has been cancelled somewhere during the development process
Escalated
Full Engagement (CMO Integration)
This was auto-generated by JIRA Service Desk during workflow import
Checked into GIT Develop
Development Done
Merged to Release
Deploy On TST
Dev Passed
Dev Testing
Reviewed
STG Testing
TST Passed
TST Testing
Release to QA
Release to QA
Deploy on DEV
Deploy on DEV - 2
For a workflow with multiple dev servers
Dev Testing - 2
Deploy on Dev - 3
For multiple dev servers
Dev Testing - 3
Testing for multiple dev servers
Backlog
Selected for Development
DNA Preparation
IN-Expression
IN-Purification
Execution
Decommissioned
Deployed
Deployment complete - version can now be released.
Redeployed
Reopened to Work
Defer to Future
Ready for Dry Run
DEV In Progress
DEV In Progress
QA Test in Progress
New
Rejected/Cancelled
Reopen
Dry Run In Progress
Dry Run In Progress
Vendor Risk Profiling
No Assessment Needed
Remote Assessment
Onsite Assessment
Limited Engagement
Awaiting CAB approval
This was auto-generated by JIRA Service Desk during workflow import
Planning
This was auto-generated by JIRA Service Desk during workflow import
Awaiting implementation
This was auto-generated by JIRA Service Desk during workflow import
Implementing
This was auto-generated by JIRA Service Desk during workflow import
Peer review / change manager approval
This was auto-generated by JIRA Service Desk during workflow import
Completed
This was auto-generated by JIRA Service Desk during workflow import
Under investigation
This was auto-generated by JIRA Service Desk during workflow import
Vendor Controls
Pfizer Performs Attack and Penetration Testing
Following Vendor Controls, Perform Attack and Penetration Testing on the Device.
Vendor Performs Attack and Penetration Testing
Following Vendor Controls, Externally provided Attack and Penetration Testing
Procurement
Procure the Device
On-Site Assessment
On- Site Risk Assessment
Security Questionnaire
Security Questionnaire for Security Assessment
Security Contact Engaged
Yellow or Red Flagged Security Controls
Disposition CRS
IPRM Solution Profile
Third Party Performs Attack and Penetration Testing
Third Party Performs Attack and Penetration Testing
Remediation
Remediation after failed testing
CMDB Record
CMDB Master and Production CI Creation
SDLC Documentation
SMD Form
Create SMD Form
Won't Do
Ready for QA Test
On Hold
(Migrated on 2 Feb 2022 14:54 UTC)
Code Migrated
Request Manager
Initial Approval
Biobook
UX New
DT - New
In UX Research
DT-In UX Research
In UX Design
DT-In UX Design
UX Ready to Release
DT-UX Ready to Release
UX Done
DT-UX Done
Approved for Dev
DT-Approved for Dev
Vendor Selection
Core Team Engagement
Contracting
Business & BT Assessments
Vendor Status Determination
Initiate QMS09
Complete Vendor/ARO Assessment
Not Needed
Vendor Response Review
Complete Business Case Summary
QMS09 Team Review
Create Master & Production CI Records
Pending Approval
Legal Input
SMD-SC Report
Classification & Next Steps
SMD Decision
Supplier Control Assessment Decision
VCAS Form
SCA Report Provisions
Assess Risk
GIS Contact Engaged
Review Vendor Response
Final Report from GIS
Determine Route of Testing
Deployed in Test
This status is managed internally by JIRA Software
Testing
P3 Project
In Testing
This status is managed internally by JIRA Software
System Test
Cancel
Transition to R&R
Shadow Period
Ready for UX
Ready for UX
UX Design In Progress
UX Design In Progress
Design Complete
Design Complete
Update Req
Update Req
Ready for Sprint Planning
Ready for Sprint Planning
DEV Estimate In Progress
DEV Estimate In Progress
To Do
(Migrated on 2 Feb 2022 14:54 UTC)
Cannot Be Reproduced
Future Enhancement
Needs More Information
Initial Request
Experimental Design Discussion
Experiments
Evaluation
Image Analyses
Final Report
Selected for UC Review
Waiting/On Hold
This status is managed internally by Jira Software
In Development
GIS Solution Testing
Security Risk Assessment
Review Prevalent Report
Submit Request
Ready to Migrate
Off Boarding Complete
Code Review In Progress
RM Onboard Request
Identity Verification Email Flow
Get Access Team Contact
Identity Verification Complete
Get Access
Not SMD
CFP Portal Access
Work In Progress
This was auto-generated by JIRA Service Desk during workflow import
Alert Design
Alert Review
Approved for Production
Deployment
Implement Change
In Production
New Proposal
Pending Review
Proposal Approved
This issue is being actively worked on at the moment by the assignee.
Loaded
Confirm Ownership
The issue is pending confirmation on its remediation ownership
Ownership Rejected
The initial remediation owner has rejected asset ownership
Waiting for Plan
Asset ownership is accepted and is pending vulnerability remediation plan
Send Request Engagement Email
Ready for Code Review
Core Team Engaged
Inactive
No Action
Plan Submitted
Vulnerability remediation plan is submitted but yet to be implemented
Plan Implemented
Vulnerability remediation is implemented and is ready for validation
Remediation Confirmed
Vulnerability remediation is confirmed
Pending for Decommission
Duplicate
Main Task Logic Updated
Awaiting Mitigation Confirmation
Exception Modification in Progress
Need More Info
PANS Approved
Monitoring Ended
Monitoring Started
Submitted
Hard Closed
Soft Closed
Assessment Review Complete
Assessment Review In Progress
Ready For Test
Status added for the project "Promo Mix Simulator" as part of ticket GHSS-1407
Registration Link Sent
Risk Criteria Met
Risk Detected
Supplier Assessment Complete
Supplier Assessment Initiated
Welcome Letter Sent
Level 1 Review
Level 2 Review
Awaiting Survey Completion
Survey Completed
Request Reviewed
This status is managed internally by JIRA Software
Review Contract
This status is managed internally by JIRA Software
Awaiting Response for ERQ
BAU Closed
ERQ Completed
Expedited BAU Closed
IRA Completed
N/A Closed
Initiated
Data Gathering
Waiting for Scheduling
Waiting for Approval
This was auto-generated by JIRA Service Desk during workflow import
Waiver Approved
Exception Approved
Closed
The issue is considered finished, the resolution is correct. Issues which are closed can be reopened.
Ownership Confirmed
Patch Planning Complete
Patch Quantification
Exception Closed
Approved with Additional Mitigation
Code Review
Status added for the project "Promo Mix Simulator" as part of ticket GHSS-1407
Migrate Code to TEST
Migrate Code to TEST
Migrate Code to Dry Run
Scheduled Review
Code Review & Migration
Active
To check the status of the URG is active
Open
This was auto-generated by JIRA Service Desk during workflow import
Story Points
This status is managed internally by Jira Software
Admin Entry
Admin Action
Ready for Merge
Deployed to Dev
Deployed to test
Ready for Release
(Migrated on 2 Feb 2022 14:54 UTC)
Released
PANS E&W Approved
Redirecting
Exception with Further Action
Waiver with Further Action
Pending Information
Pending DGB Review
Pending Change Completion
HOLD
Build
Pending Digital Approval
Publish Data Availability
Publish data profile, enable alerting, create feed documentation, and communicate source availability.
Data Asset Library Entry Creation
Create entry in the CAS Data Asset Library. Step must be completed and ticket linked before proceeding to DGB Review.
Pending Data Stewart Review
PANS E&W Submitted
USB Unlocked
Queued for Processing
USB Locked
Request Denied
Change Control Board
In Assessment
Assessment complete
Data Remediation
Assessment In Progress
Updates in progress
Ready for Review
Ready for Testing
Test Ready for Review
Test Review in progress
Ready for updates
Retired
Deferred
Informal Testing
This status is managed internally by Jira Software
Technical Team Review
Business Design Review
Ready for Demo
(Migrated on 2 Feb 2022 15:13 UTC)
Additional Development Required
Goverance Required
Author Dry in progress
Ready for secondary dry run
Secondary Dry in progress
Ready for crystal review
Crystal Review in progress
In Design
Hot Fix / Patch Or New Code
Hot Fix or new Code
Develop / Update Code In Pfizer Development Folder
Develop / Update Code In Pfizer Development Folder
Update ALMQC and TeamForge artifact and rules if required
Update ALMQC and TeamForge artifact and rules if required
Update test Script in ALMQC
Update test Script
Provide Time and Date for Production Release
Provide Time and Date for Production Release and UAT Schedule
Execute manual / Automated test as appropriate is AIMQC
Execute manual / Automated test as appropriate is AIMQC
Move the Code to the respective module
Move the Code to the respective module under the Pfizer Folder(Such as Pfizer/EPV, Pfizer/CMDB)
Integration Testing Completed ?
Integration Testing Completed ?
Unit Test
To Realese to PROD
To Release to PROD
Failed
(Migrated on 2 Feb 2022 15:13 UTC)
Blocked
(Migrated on 2 Feb 2022 15:13 UTC)
Test Passed ?
Test Passed
Passed
Is Operational Readness Review needed ?
Is Operational Readness Review needed ?
To code Review
To code Review
Disclose unique aspect of escalation matrix
Disclose unique aspect of escalation matrix
To Hot Fix / Patch WorkFlow
To Hot Fix / Patch WorkFlow
To Backlog Refinement
To Backlog Refinement
Copy
From start to Progress
To Defect Management
To Defect Management
Create Defect in Teamforge and assign in Sprint Team
Create Defect in Teamforge and assign in Sprint Team
Create / Update Test Cases
Create / Update Test Cases and trace Back to Functionality Developed
Perform Walk through of functionality from user Perspective
Perform Walk through of functionality from user Perspective
From Code Review,Sprint Demo or Testing
From Code Review, Sprint Demo or Testing
To Operation Readness Review
To Operation Readness Review
To Release to Prod
To Release to Prod
Paused
Create/Update Design Document
Start Sprint
From Sprint
Perform IOD Operation of any hyper care plans
Perform IOD Operation of any hyper care plans
Review any Open Defect to determine if release
Review any Open Defect to determine if release should Continue or move Forward
Ready to Merge
This status is managed internally by Jira Software
Awaiting Remediation
Review
This status is managed internally by Jira Software
Coming Up - To do
This status is managed internally by Jira Software
Waiting for follow-up
This status is managed internally by Jira Software
Content Development
This status is managed internally by Jira Software
Approved by Communications
This status is managed internally by Jira Software
Sent to Communications Team
This status is managed internally by Jira Software
Sent to Print
This status is managed internally by Jira Software
Meeting Scheduled
This status is managed internally by Jira Software
Event Scheduled
This status is managed internally by Jira Software
ISAR Assessment Scheduled
This status is managed internally by Jira Software
Information
This status is managed internally by Jira Software
Test
This status is managed internally by Jira Software
Review Code
This status is managed internally by Jira Software
Focus
This status is managed internally by Jira Software
QA Complete
Gather Requirements
Create/Update Design
Move Code to pfizer repo
Vetting
This status is managed internally by Jira Software
Kanban backlog
This status is managed internally by Jira Software
Release to Test
Complete
Test In-Progress
Blocked for Defect
Capture Test Evidence
Release To Prod
Epic , Stories , Task & Sub-Task
Ready To Retest
Dev Rejected / Not a Bug
CRS Evaluation
Determine Qual Path ( Continuous Release / SLM)
Test Documentation
Test Excution & MSB Sign off
RFC & SLM Closure
Operational Hand Off & Documentation
Release / Enable and Service
Blockers
This status is managed internally by Jira Software
Re-Open
Status added for the project "Promo Mix Simulator" as part of ticket GHSS-1407
Waiting for GIS Approval
Waiting for PRB Approval
Approval Required
Dev Done
Build Stories
Project Decision
Assign to Backlog
Bid to Market Place
Received Proposals
Review and Finalize a Proposal
Project Owner Approval
Contract Execution
Collect
This status is managed internally by Jira Software
Validate
This status is managed internally by Jira Software
Remediate
This status is managed internally by Jira Software
Design In Progress
This status is managed internally by Jira Software
Ready for Build
This status is managed internally by Jira Software
Dev Test
This status is managed internally by Jira Software
Parking Lot
This status is managed internally by Jira Software
Out of Scope
This status is managed internally by Jira Software
In Queue
Up Next
Start
SPA Review
Implement
IDA Review
Assessment completed
TS Drafting In Progress
B/T Review In progress
B/T Approved
IVT in progress
Compliance Review In Progress
FVT In Progress
Final Compliance Review
FVT Approved
Development
Status added for the project "Atlas Cloud PGS Solutions" as part of ticket GHSS-832
DESIGN
Design the change (using agreed requirements)
Verification
This status is managed internally by Jira Software
Close Out
This status is managed internally by Jira Software
QA Migration
Status added for the project "Atlas Cloud PGS Solutions" as part of ticket GHSS-832
Prod Migration
Status added for the project "Atlas Cloud PGS Solutions" as part of ticket GHSS-832
Dev Test Completed
Dry Run Completed
Ready for QA
QA In Progress
Issue Raised
Analysis/Design
Status added for the project "Atlas Cloud PGS Solutions" as part of ticket GHSS-832
Testing/UAT
Hypercase/Support Transition
Dev Completed
Dev Complete
Status added for the project "Atlas Cloud PGS Solutions" as part of ticket GHSS-917
Test Complete
Released to SIT
This status is managed internally by Jira Software
Released to UAT
This status is managed internally by Jira Software
Ready for Peer Review
This status is managed internally by Jira Software
In Peer Review
This status is managed internally by Jira Software
Blocker
This status is managed internally by Jira Software
In Test
This status is managed internally by Jira Software
In Stage
This status is managed internally by Jira Software
In-Stage Testing
This status is managed internally by Jira Software
Ready for Prod Release
This status is managed internally by Jira Software
Passed to Dev
This status is managed internally by Jira Software
Compliance Approved
Discovery: In queue
Delivery: In Queue
Discovery: Up Next
Delivery: Up Next
Discovery: In Progress
Delivery: In Progress
Reviewing
Ready
Doing
Triaging
Verifying
Pre-Production
Passed to External Team
This status is managed internally by Jira Software
PO Acceptance
This status is managed internally by Jira Software
Retest Failed
This status is managed internally by Jira Software
In-Progress
Close Issue
Assign Group & Status
IO Acceptance
This status is managed internally by Jira Software
QA/Testing
Blocked/ On Hold
Ready to start
Accepted
Acknowledged
Scope Review
Epic Creation
Peer Review
Pending Verification
In QA
Re-Opened
SME Review
This status is managed internally by Jira Software
Gather product data PDM/PEARL
This status is managed internally by Jira Software
Align Products to Components
This status is managed internally by Jira Software
Identify Active Products
This status is managed internally by Jira Software
Quality Check
This status is managed internally by Jira Software
Assigned
In Progess
Stage
This status is managed internally by Jira Software
Ready for Post-Deployment Testing
Loaded data is being reviewed for acceptability by the business users
Waiting for Fix
Ready for Deployment
Preparing
Extracted data is being prepared for loading into a new system
Validating
Loaded data is being validated for correctness (# of rows, value matches, etc.)
Accepting
Subject matter expert is reviewing the data for correctness & accepting the load is correct/good in the new system
Scheduled
Extracting
Data is being extracted from the source system
Loading
Prepared data is being loaded into the new system
SME Feedback Received
This status is managed internally by Jira Software
EDITING PACKAGING INFORMATION
This status is managed internally by Jira Software
Awaiting SME Review
This status is managed internally by Jira Software
Integrating SME Feedback
This status is managed internally by Jira Software
Waiting SME Final Approval
This status is managed internally by Jira Software
System Testing
This status is managed internally by Jira Software
UAT
User Acceptance Testing
Customer Request
Scoping
Acceptance Testing
Generate ACR
Define Detailed Scope
Implement ACR Changes on DEV System
Import to Test System
Execute ACR Testing
Transfer to Production System
Dependency
This status is managed internally by Jira Software
On Hold or Blocked
Ready to Build Form
This status is managed internally by Jira Software
Build Form "First Pass"
This status is managed internally by Jira Software
Review Form (Donna Team)
This status is managed internally by Jira Software
Upgrade Form Request
This status is managed internally by Jira Software
Test Form
This status is managed internally by Jira Software
PCO Reviw
This status is managed internally by Jira Software
In Design Review
This status is managed internally by Jira Software
Dev Prep
This status is managed internally by Jira Software
Retest
On Hold/Blocked
This status is managed internally by Jira Software
Assessment
Dev InProgress
This issue is being actively worked on at the moment by the assignee.
Dev Testing Passed
Passed Dev Testing
Ready For Technical Assessment
Ready for Progress
Trn Deployed
Ready For Bundling
Under Technical Assessment
Awaiting Funding
Tst Deployed
Dev Deployed
Prd Deployed
Require Business Review
Stg Deployed
Waiting For UC
Under Business Review
Code Reviewed
Stg Passed
On Hold / Blocked / In-Queue
This status is managed internally by Jira Software
Review/Test
This status is managed internally by Jira Software
BU
This status is managed internally by Jira Software
TD
This status is managed internally by Jira Software
GL (Go-live)
This status is managed internally by Jira Software
BU (Build)
This status is managed internally by Jira Software
TD (Test/Demo)
This status is managed internally by Jira Software
CR (Code Review)
This status is managed internally by Jira Software
Report Configuration
This status is managed internally by Jira Software
User Acceptance Testing
This status is managed internally by Jira Software
Project Intake
This status is managed internally by Jira Software
Data Assessment
This status is managed internally by Jira Software
Scoping Inputs Received
This status is managed internally by Jira Software
KPIs Finalized
This status is managed internally by Jira Software
Hypercare
This status is managed internally by Jira Software
Validation
This status is managed internally by Jira Software
Analysis / Design
This status is managed internally by Jira Software
New Column
This status is managed internally by Jira Software
Form Review
This status is managed internally by Jira Software
Internal Review
This status is managed internally by Jira Software
Owner Review
This status is managed internally by Jira Software
Production Load
This status is managed internally by Jira Software
Steve Fix Forms
This status is managed internally by Jira Software
User Training
This status is managed internally by Jira Software
Routing for Approval
Review Step 1
This status is managed internally by Jira Software
Ready for Step 2
This status is managed internally by Jira Software
Review Step 2
This status is managed internally by Jira Software
Ready for ManuSite
This status is managed internally by Jira Software
Align/Analyse PEARL/PDM Data
Ready for CMC Review
Sent for CMC Review
Review CMC Feedback
Sent for ManuSites
Review CMC Site Feedback
Review Approved
Prepared for GPC Upload
Defined
This status is managed internally by Jira Software
CMC Review Approved
Assess Business Impact
Business Analyst
Change Control Board Decision
Process Governance
Evaluation & Recommendation
Detailed Development Assessment
High Level Development Estimation
Project Libra - ToDo
This status is managed internally by Jira Software
Finalize MVP Scope
This status is managed internally by Jira Software
Cisco
This status is managed internally by Jira Software
Closed by Customer
Need Customer Info
Refined
Test in DEV
Ready for PO Review
Refined/Open
Done/Closed
APR PMO Review
Financial Benefit Analysis
Feasibility Check
Business Assessment
Business owner to determine business need and if necessary funding available to implement change
One Pager Creation
In Code Review
This status is managed internally by Jira Software
Ready for Design Review
Ready for Approval
Awaiting Release
Testing/Validation
Status added for the project "Atlas Cloud PGS Solutions" as part of ticket GHSS-832
Ops Transition
Status added for the project "Atlas Cloud PGS Solutions" as part of ticket GHSS-832
Initial Evaluation
This status is managed internally by Jira Software
8pt Check
This status is managed internally by Jira Software
Validating on Staging
This status is managed internally by Jira Software
Funnel
This status is managed internally by Jira Software
Deploying to Production
This status is managed internally by Jira Software
Milestones
This status is managed internally by Jira Software
Code Review and Migration
Design Review
This status is managed internally by Jira Software
QA
This status is managed internally by Jira Software
Dry Run Testing
This status is managed internally by Jira Software
MTP
This status is managed internally by Jira Software
MTD
This status is managed internally by Jira Software
MTS
This status is managed internally by Jira Software
OBE
This status is managed internally by Jira Software
Other Support
Pending further information
Send to Customer
Escalate to L2
SCL Review
Rework Required
F01 To SCL
Product Sign-Off
This status is managed internally by Jira Software
To Do Now!
This status is managed internally by Jira Software
Unit Testing
This status is managed internally by Jira Software
User Demo Complete
This status is managed internally by Jira Software
Development Completed
This status is managed internally by Jira Software
Unit Testing Completed
This status is managed internally by Jira Software
Client review
This status is managed internally by Jira Software
Vulnerability Assessment In Progress
Waiting on Client Input
Ready to Publish
Published
Requirement Analysis
This status is managed internally by Jira Software
At Risk
This status is managed internally by Jira Software
Selected for Dev
This status is managed internally by Jira Software
Schedule
This status is managed internally by Jira Software
Close
Status for GPP provision form
Reevaluation_5
This status is managed internally by Jira Software
Follow Up
This status is managed internally by Jira Software
Follow Up BPO
This status is managed internally by Jira Software
Delayed
New Demand
Estimation
Estimation Review
Estimation Approved
WO/SOW
Project Execution
EXISTING POD/TEAM
WITHDRAWN
Owner Closed
Deployed to Prod
This status is managed internally by Jira Software
UAT testing
This status is managed internally by Jira Software
DEFINE SCOPE
AREA LEAD PRE-APPROVAL
CREATE/UPDATE TEST CASES
VERIFICATION PRE-APPROVAL
PERFORM BACKUPS
Post-Deployment Verification
This status is managed internally by Jira Software
Initiate
Allocated POD/TEAM
Execute
Estimate
Blocked/Reviewed
This status is managed internally by Jira Software
Peer Review Complete
UAT Deployment In Progress
Peer Review In Progress
UAT Deployment Completed
Pending Digital Pre-Approval
Pending Compliance Pre-Approval
Production Deployment In-Progress
Requirements and Design Approval
Code and Build
Pending UAT Migration Approval
Task
Production Deployment Complete
UAT Complete
Project Signoff
Sent for Approval
This status is managed internally by Jira Software
Documentation Review
This status is managed internally by Jira Software
Pre-Approved
This status is managed internally by Jira Software
Ready for retest
Detailing
Details being added/updated.
Accomodate in Current Release
Change Rejected
Rejected
SR Closed
Restored
SR Open
Estimating
Estimation
Deferred till next phase/release
Change Request Open
Change Request Open
Ready for Deploy
Tested
This status is managed internally by Jira Software
Testing Completed
This status is managed internally by Jira Software
Released to Prod
Released to Test
Ready for UAT
Deployment Complete
Status added for the project "Promo Mix Simulator" as part of ticket GHSS-1407
Deployment Ready
Status added for the project "Promo Mix Simulator" as part of ticket GHSS-1407
Development In Progress
Unit Testing In Progress
Resolving
Build : On-Track
Build : On-Hold
Sign-Off
Testing : Delayed
Solution Approved
Design : On-Track
Testing : On-Hold
Design : On-Hold
Deployment : On-Hold
Design : Delayed
HL Solution : On-Hold
Build : Delayed
Champion Research
Sprint Allocated
Ready for Solution Approval
This issue is being actively worked on at the moment by the assignee.
Deployment : Delayed
Deployment : On-Track
Testing : On-Track
HL Solution
HL Solution : Delayed
Intake
Pending Customer
Not provisioned
Suspended
Accepted for provisioning
PENDING GBI
PENDING WITH SAP
Status created for BOBJ Upgrade Issue tracker
Not planned
This status is managed internally by Jira Software
In Progress -- EMEA
This status is managed internally by Jira Software
START BUILD
All Approved Change to START Here
BUILD & SIT
Build (develop/code) the change and perform system integration tests of the change
UAT DEPLOYMENT
Deploy Change into UAT Environment
Cancel or Reject
Waiting for Vendor
Status used by BAES Service Desk
In Progress -- ex-US
This status is managed internally by Jira Software
OAT
Allocate to a RELEASE
This is the holding point for approved and funded change that now needs to be allocated to a release
NEW REQUEST
TRANSFER
Change request can be transferred to another project
Engineering Review
Requirements
Gather the requirements for this change
Product Backlog
Production Deployment
Deploy UAT Accepted change into PRODUCTION environments
Ready for Assessment
Means actioned for PO review on dec etc, DEV moves task to this state
Approve Design Stagegate
SIT & UAT
Build & Test
DEPLOYMENT STAGEGATE APPROVED
PENDING ADDITIONAL INFO
Peer Review and Assessing
CHANGE MANAGER PRE APPROVAL
GBA TEST ACCEPTANCE
NPROD IMPLEMENTATION
Test scenarios pending
TEST ACCEPTANCE WITH ISSIUE (N)
BT APPROVAL
SCHEDULING
TEST ACCEPTANCE
BT TEST ACCEPTANCE - N+P
CHANGE MANAGER TECH APPROVAL
PROD DEPLOYMENT TESTS
Business Approved
GBA TEST ACCEPTANCE PROD
Responded
Ticket has been assigned and answered by Service Desk
Waiting for Insights
This status is managed internally by Jira Software
REVIEW FAILED
Passed to Engineering
NPROD DEPLOYMENT TESTS
TEST ACCEPTANCE (N)
Support Engineer Review & Approval
SIT
BT TECH APPROVAL
Change manager approval
Functional tests
BT TEST ACCEPTANCE PROD
Planned
ERROR TEST ACCEPTANCE
BT TEST ACCEPTANCE - N+P -E
PROD Implementation
Continuous
Analysis
Pending Business Input
Requirement Approved
Vendor estimation
Vendor Assessment
SOW Creation
Change completed
Ready for CAB
CAB Review Status
SOW Sign Off
Design Requirements
Implementation Review
Ideas Forum
Pending Scheduling
TRANSFERRED
Change has been transitioned to the service workflow
GBI Engineering review
The change is now under GBI engineering review and assessment
Approved (BT)
Technical Assessment and Design
The change should now be assessed technically and design detailed and planned
Place On Hold
GBI ASSESSMENT
GBI Leadership to determine the correct type of change
APPROVE - Business
This change will require Business Funding to implement and Business need to approve commercials
Approved (Business)
APPROVE -- GBI
The change is now ready for approval at CAB and for inclusion in a release
Ready for Solution
This status is managed internally by Jira Software
GBA APPROVAL
Scope
Scope on hold
Init. refused
FINISHED
Problems
Project on Hold
Under Testing
This status is managed internally by JIRA Software
Waiting Feature Development
Ready for Work
Authorize
Develop
Digital Test
Prod Deployment
Verify
Ready for Development
Result Analysis
Data Ingestion
Build Measures
Visualize
Final Steps
This status is managed internally by Jira Software
Risks & Blockers
This status is managed internally by Jira Software
Ready for Product Owner
This status is managed internally by Jira Software
Blocked Swimlane
This status is managed internally by Jira Software
Front End
This status is managed internally by Jira Software
Dry Run
This status is managed internally by Jira Software
Code Demo
This status is managed internally by Jira Software
Ready for Sign-off
This status is managed internally by Jira Software
Ingestion
This status is managed internally by Jira Software
Ready for Legal/HR Review
This status is managed internally by Jira Software
To Be Implemented
This status is managed internally by Jira Software
Requirements in QC/Closed
This status is managed internally by Jira Software
Agreed to Pursue (Based on Sta
This status is managed internally by Jira Software
System Integration Testing
This status is managed internally by Jira Software
PROD
This status is managed internally by Jira Software
Awaiting Input
Validation Failed
MVP Requirements
Selected for Functional Requirements / Development
SIT Testing
Draft / Testing
This status is managed internally by Jira Software
BSL Review
This status is managed internally by Jira Software
TBC1
TBC2
GRL Input
Preparing for GPC Upload
In QC Dashboard
Uploaded into GPC
Descoped
TBC3
Content Need
This status is managed internally by Jira Software
Needs Review/Confirmation
This status is managed internally by Jira Software
Sprint Backlog
This status is managed internally by Jira Software
DEV Backlog
This status is managed internally by Jira Software
Dev Sprint
This status is managed internally by Jira Software
PL Backlog
This status is managed internally by Jira Software
Active Sprint (DEV)
This status is managed internally by Jira Software
Deployed in Dev
This status is managed internally by Jira Software
Shutdown
Demo
This status is managed internally by Jira Software
Infra Readiness
Build + UT
Closed/Done
Merged into Feature Branch
This status is managed internally by Jira Software
Operations In-Progress
This status is managed internally by Jira Software
Risks & Blocker
This status is managed internally by Jira Software
Dependencies
This status is managed internally by Jira Software
Bugs & Defects
This status is managed internally by Jira Software
SME's Tasks
This status is managed internally by Jira Software
Ongoing (No Deadline)
This status is managed internally by Jira Software
Next Up (for next 1-2 mos)
This status is managed internally by Jira Software
Delivered (In Review)
This status is managed internally by Jira Software
In QA (In Dev)
This status is managed internally by Jira Software
QA Verified
This status is managed internally by Jira Software
Product Owner Review
This status is managed internally by Jira Software
In STG
This status is managed internally by Jira Software
Transferred to Portfolio
Ready to Release
On Hold / Defer
Transferred to Roadmap
Transferred to SR
Dev - Build
Dev - Analysis
Dev - UAT
Dev - System Test
On Hold / Blocked
Awaiting Approval
Pending Closure By Cab
Complete Pending Confirmation
Go-Live In Progress
Waiting for clarification
Changes implemented
In UAT
Test Case Prepared
UAT Approved
In Dev
QA Passed
Asset Received
UAT Feedback
Ready For SIT
Building
Source code has been committed, and JIRA is waiting for the code to be built before moving to the next status.
Post-Approval
P3 Project
Pre-Approval
P3 Project
04 - Actioning
10 - Rejected
09 - Closed
The issue is considered finished, the resolution is correct. Issues which are closed can be reopened.
Proposal Submission
START RELEASE
All Approved Change to START Here
Engineering
Script writing in progress
Script Ready for PO approval
Ready for Formal testing
Formal testing in progress
Ready for QA (In Dev)
This status is managed internally by Jira Software
In QA (On Dev)
This status is managed internally by Jira Software
PO Acceptanc
This status is managed internally by Jira Software
PROD MIGRATIO
This status is managed internally by Jira Software
Awaiting Other
This status is managed internally by Jira Software
Selection Analysis
This status is managed internally by Jira Software
On-DNA hit confirmation
This status is managed internally by Jira Software
HT Sequencing
This status is managed internally by Jira Software
Off-DNA Synthesis
This status is managed internally by Jira Software
Project Teams Off-DNA Testing
This status is managed internally by Jira Software
Formal Testing Completed
Analyzing
This status is managed internally by Jira Software
Portfolio Backlog
This status is managed internally by Jira Software
Block
This status is managed internally by Jira Software
Authorization
Exception Submitted
Ready for Sign off
This status is managed internally by Jira Software
Ready for Internal Testing
Internal Testing
Candidate for Test Release
Candidate For Stage Release
Stage Testing
Candidate for Production Release
Production Release
To Do (Sprint)
This status is managed internally by Jira Software
Awaiting Other(s)
This status is managed internally by Jira Software
Ready for Prod
This status is managed internally by Jira Software
Pre-Selection Validation
This status is managed internally by Jira Software
Del Selection
This status is managed internally by Jira Software
Project team off-DNA testing
This status is managed internally by Jira Software
Approved for Execution
Execution in progress
Test Run approval
Test Run Approved
Pending Clarification
Requirements Gathering/Scoping
Qualification
Ready for Sprint
Requirements Gathering
Development Complete
PO Approval
SD Vetting
This status is managed internally by Jira Software
EPS Approval
This status is managed internally by Jira Software
Not Approved
This status is managed internally by Jira Software
Pending Execution
This status is managed internally by Jira Software
Questions
Almac QA Review
Other Communication
Waiting for Gate Keeper
Ready for Support
ARD/VRD Review
User Testing
QA Review
This status is managed internally by Jira Software
PO Review / Demo
This status is managed internally by Jira Software
Expired
Scan Complete
ITFM UPLOAD
This status is managed internally by Jira Software
ITFM Scrub
This status is managed internally by Jira Software
Abandoned
Decision Sent
all
To Do - Phase 2
This status is managed internally by Jira Software
In progress - Phase 2
This status is managed internally by Jira Software
Done - Phase 2
This status is managed internally by Jira Software
QA(Unit Test)
This status is managed internally by Jira Software
AC Validation
This status is managed internally by Jira Software
Initial Review
CAB Review
Ready For Billing
This status is managed internally by Jira Software
Pre-Assessment CAB Review
Ready for MTP
On-Hold
Customer Feedback Pending
Report Approved
Report Rejected
Logged
Plan
This status is managed internally by Jira Software
Analysis - In progress
This status is managed internally by Jira Software
Analysis - Done
This status is managed internally by Jira Software
Dev - In progress
This status is managed internally by Jira Software
Dev - Done
This status is managed internally by Jira Software
Certify - In progress
This status is managed internally by Jira Software
Certify - Done
This status is managed internally by Jira Software
Deploy - In progress
This status is managed internally by Jira Software
Fix in Progress
Create SOW
SDLC
SSE-Done
SSE-In Progress
SSE-New
TL-New
TL-In Progress
TL-Done
SDM-New
SDM-In Progress
SDM-Done
LT-New
LT-In Progress
LT-Done
Release Scheduled
Requirement & Analysis
This status is managed internally by Jira Software
Developing
This status is managed internally by Jira Software
PR Review
This status is managed internally by Jira Software
Planningx
This status is managed internally by Jira Software
Scopingx
This status is managed internally by Jira Software
Cancelx
This status is managed internally by Jira Software
Change Request
Governance Review
effort assessment
final governance decision
confirm delivery
Ready for Testing [Test]
This status is managed internally by Jira Software
Ready to Deploy to Dev
This status is managed internally by Jira Software
To Deploy In Test
This status is managed internally by Jira Software
Pre-Assessment Check
Business Review and Sign off
Ready in Dev
This status is managed internally by Jira Software
Ready in QA
This status is managed internally by Jira Software
UAT & Code Review
This status is managed internally by Jira Software
Move to Prod
This status is managed internally by Jira Software
Technical review
This status is managed internally by Jira Software
To Deploy in Prod
This status is managed internally by Jira Software
Issues/Delays
This status is managed internally by Jira Software
Reporter Input
This status is managed internally by Jira Software
Reporter blocked
This status is managed internally by Jira Software
Reporter Closure confirmation
This status is managed internally by Jira Software
Pass to Delivery Team
This status is managed internally by Jira Software
Reporter approve - in progress
This status is managed internally by Jira Software
Reporter approve - Done
This status is managed internally by Jira Software
Sanity check
This status is managed internally by Jira Software
Deploy QA - In progress
This status is managed internally by Jira Software
Deploy DryRun - In progress
This status is managed internally by Jira Software
To Be Triaged
This status is managed internally by Jira Software
Overdue
This status is managed internally by Jira Software
Passed back to vendor
This status is managed internally by Jira Software
Linked to other case
This status is managed internally by Jira Software
Build & Unit Testing
This status is managed internally by Jira Software
UAT / OAT
This status is managed internally by Jira Software
Requirements Confirmation
Pending Development
Pending Release
Pending Informations
Deploy QA - Done
This status is managed internally by Jira Software
Attach Artefacts
Attaching all the artefacts including approvals (Migrated on 2 Feb 2022 15:13 UTC)
Deployment Initiated
In SDLC workflow: When deployment team is ready for MTP (Migrated on 2 Feb 2022 15:13 UTC)
On Stage
(Migrated on 2 Feb 2022 15:13 UTC)
Deployment Slot Confirmation
(Migrated on 2 Feb 2022 15:13 UTC)
Deployment Completed
(Migrated on 2 Feb 2022 15:13 UTC)
Submitted to Deployment Team
(Migrated on 2 Feb 2022 15:13 UTC)
Ready to do
This status is managed internally by Jira Software
Under Analysis
Reviewed - Closed
Delivery Team alignement
This status is managed internally by Jira Software
Delivery Team alignment
This status is managed internally by Jira Software
Risk Rating – In Progress
Risk Rating – Done
Prepare – In Progress
Prepare – Done
Approval QA – In Progress
Approval QA – Done
Deployment QA - In Progress
Deployment QA - Done
Approval Prod – In Progress
Approval Prod – Done
Deployment Prod – In Progress
Verification – In Progress
QA - In Progress
This status is managed internally by Jira Software
Test Ready
Collecting Requirements
Mapping Business Process
Issue To Support
User Stories
Creating/Edit Mock-Ups
Priority
Acceptance Criteria
Business Objectives for PI
Demo MockUps
Code-Built
System/Unit Testing
Demo User Story
TSV in MSB
Deploy In Stage
Stage Smoke Testing
Execute UAT
Verify DoD
Create FD/TD/VS/AM/TM
FD/TD/VS/AM/TM in MSB
RFC Creation
KT Call
PROD Smoke Testing
Perform Training
In Progress - QA
This status is managed internally by Jira Software
Cleavable Linkers
Done in QA
This status is managed internally by Jira Software
In Progress - Sandbox
This status is managed internally by Jira Software
Grooming Completed
User Acceptance
This status is managed internally by Jira Software
Await ER
This status is managed internally by Jira Software
Prep for QA
This status is managed internally by Jira Software
Prep for Prod
This status is managed internally by Jira Software
QA Testing In Progress
This status is managed internally by Jira Software
Await Others
This status is managed internally by Jira Software
To Schedule
This status is managed internally by Jira Software
Need Info
This status is managed internally by Jira Software
Needs Info
This status is managed internally by Jira Software
Pushed in DEV
This status is managed internally by Jira Software
Client Testing (Prod)
This status is managed internally by Jira Software
MB Development
This status is managed internally by Jira Software
Client Testing (DEV)
This status is managed internally by Jira Software
Pushed In QA
This status is managed internally by Jira Software
Client Testing (QA)
This status is managed internally by Jira Software
Pushed In PROD
This status is managed internally by Jira Software
Out of cope
This status is managed internally by Jira Software
Commit Repo to GitHub
This status is managed internally by Jira Software
In Test (Dev/QA)
Review (PO)
Issue/Roadblock
This status is managed internally by Jira Software
Stakeholder Review
Release Complete
WAITING FOR CLARIFICATIONS
(Migrated on 2 Feb 2022 14:54 UTC)
Reviewing.
This status is managed internally by Jira Software
Analyzing.
This status is managed internally by Jira Software
Researching
Design & Build
Detailed Planning
Sent for execution (RFC/EPM)
This status is managed internally by Jira Software
Waiting on Plan
SOP / WI / CR2 Updates
This status is managed internally by Jira Software
Waiting for Customer - In Progress
Waiting for Customer - Done
Dev Testing - In Progress
Dev Testing - Done
Pending Approval - In Progress
Terminated
Deployed to Test- Ready for Testing
Deployed to Stage - Ready for Testing
Scope Analysis
This status is managed internally by Jira Software
Mapping File Soft Approval
This status is managed internally by Jira Software
QA migration Doc Preparation
This status is managed internally by Jira Software
QA Approvals
This status is managed internally by Jira Software
QA Testing
This status is managed internally by Jira Software
RFC QA Approval
This status is managed internally by Jira Software
Dry Run Testing Complete
Ops Validation
This status is managed internally by Jira Software
Risk Rating Approval - In Progress
Risk Rating Approval - Done
Dev ALM Test Approval - In Progress
Compliance & Approval
This status is managed internally by Jira Software
Validation CDM
This status is managed internally by Jira Software
Compliance
This status is managed internally by Jira Software
Risk / Issues
This status is managed internally by Jira Software
Documentation Writing
This status is managed internally by Jira Software
Checking - In Progress
Checking - Done
Dev ALM Test Approval - Done
QA Testing - In Progress
QA Testing - Done
QA ALM Test Approval - In Progress
QA ALM Test Approval - Done
Prod Testing - In Progress
Prod Testing - Done
PROD ALM Test Approval - In Progress
Dev Merge - Ready For Testing
This status is managed internally by Jira Software
Pending Market Feedback
Q/A (Unit Test)
This status is managed internally by Jira Software
Locked
This status is managed internally by Jira Software
Activities
This status is managed internally by Jira Software
Acknowledged - Unassigned
Draft in Progress
QC 2 in Progress
QC 2 Approved
Awaiting Client
This status is managed internally by Jira Software
Pending RFC
Request is verified in test and now ready to move to Stage via RFC
Mitigated
This status is managed internally by Jira Software
Pass to Delivery Team To Do
This status is managed internally by Jira Software
Pass To Delivery Team Urgent
This status is managed internally by Jira Software
Build In Progress
This status is managed internally by Jira Software
POC In progress
This status is managed internally by Jira Software
Waiting for Business Approval
This status is managed internally by Jira Software
Design Phase
This status is managed internally by Jira Software
STAGE RELEASE
PRODUCTION CANDIDATE
Waiting for Acceptance
This status is managed internally by Jira Software
Interruption Buffer
This status is managed internally by Jira Software
Interruption Buffer (Unplanned
This status is managed internally by Jira Software
Waiting For...
This status is managed internally by Jira Software
On queue(IPM Draft)
Assigned(IPM Draft)
IPM Draft Submitted
On queue (QC 2)
Assigned (QC 2)
Initial QC 2 Submitted
Study on Hold
Pending Client Response
This status is managed internally by Jira Software
Create/Update Task
Move to Test
Ready for Production
This status is managed internally by Jira Software
Ready for implementation
This status is managed internally by Jira Software
Waiting for Closeout
This status is managed internally by Jira Software
Scheduled for breakdown
This status is managed internally by Jira Software
Waiting For Eng/Sec
This status is managed internally by Jira Software
Issues/Blockers
This status is managed internally by Jira Software
Data recon
This status is managed internally by Jira Software
CHECKING -WAITING FOR
WAITING FOR ASSESSMENT
CHECKING - INSUFFICIENT DETAILS
ASSESSMENT - IN PROGRESS
WAITING FOR POST ASSESSMENT
CLOSURE CONFIRMATION
POST CLOSURE CONFIRMATION ASSESSMENT
POST CLOSURE CONFIRMATION PENDING UPSTREAM
WAITING FOR CORE DEV FIX
WAITING FOR CR
CORE DEV FIXING
CORE DEV CHANGE REQUEST
WAITING FOR POST REPORTER TESTING FIXING
POST REPORTER TESTING FIXING
REPORTER TESTING - IN PROGRESS
WAITING FOR PROD DEPLOYMENT
PROD DEPLOYMENT - IN PROGRESS
WAITING FOR POST DATA OWNER APPROVAL CHECKING
POST DATA OWNER APPROVAL CHECKING
DATA OWNER APPROVAL - IN PROGRESS
WAITING FOR DEVELOPMENT
DEVELOPMENT - IN PROGRESS
WAITING FOR INNER TEST
WAITING FOR POST INNER TEST FIXING
POST INNER TEST FIXING - IN PROGRESS
INNER TEST- IN PROGRESS
In-review
This status is managed internally by Jira Software
ASSESSMENT - PENDING UPSTREAM
FIXED
For Review
This status is managed internally by Jira Software
Working items
This status is managed internally by Jira Software
Small Projects
This status is managed internally by Jira Software
Need Refinement
In Security Testing
Scheduled for Deployment
Forecast
Closeout
Final Review
This status is managed internally by Jira Software
Pending Business Sign-off
Blocked by business
Document Creation
This status is managed internally by Jira Software
Being scheduled
This status is managed internally by Jira Software
SQL Matrix creation-In Progress
SQL Matrix Approval-In Progress
SQL Matrix Approval-Done
QA PR AI/CR Task Update-In Progress
QA PR AI/CR Task Update Approval-In Progress
QA PR AI/CR Task Update Approval-Done
QA Ranger Onboard-In Progress
QA Ranger Onboard-Done
PROD PR AI/CR Task Update-In Progress
PROD PR AI/CR Task Update Approval-In Progress
PROD PR AI/CR Task Update Approval-Done
PROD Ranger Onboard-In Progress
PROD Ranger Onboard-Done
Prod ALM Test Approval-Done
Post-prod PR AI/CR Task update-In Progress
Post-prod PR AI/CR Task update approval-In Progress
Waiting for Engineering
This status is managed internally by Jira Software
Waiting for Information
Test Script QA
READY POR PROD
This status is managed internally by Jira Software
Digital Test Signed-Off
Digital Test Signed Off
This status is managed internally by Jira Software
Accepted - Planning
Accepted - Active
Accepted - Delivered
Canceled/Closed
Old Stuff I can't delete
This status is managed internally by Jira Software
CTI Review
This status is managed internally by Jira Software
Hand-off
This status is managed internally by Jira Software
Customer Review
This status is managed internally by Jira Software
Common Data Collection
This status is managed internally by Jira Software
Pre-Discovery Analysis
This status is managed internally by Jira Software
Customer Discovery
This status is managed internally by Jira Software
Refining & Planning
This status is managed internally by Jira Software
Under Assessment
EU_FMD
This status is managed internally by Jira Software
On Track
Behind Schedule
Parked
This status is managed internally by Jira Software
Move to Execution
This status is managed internally by Jira Software
Move
This status is managed internally by Jira Software
EMVO Q&A
This status is managed internally by Jira Software
Historical Cases
This status is managed internally by Jira Software
knowledge DB
This status is managed internally by Jira Software
Ready to Pull
This status is managed internally by Jira Software
Refinement
Ready for Design
External Review
Next
This status is managed internally by Jira Software
column
This status is managed internally by Jira Software
Pending change
Dev
This status is managed internally by Jira Software
QA Preparation (Compliance)
This status is managed internally by Jira Software
Dev Sign-Off & Validation(OP)
This status is managed internally by Jira Software
QA Sign-Off & Validation(PO)
This status is managed internally by Jira Software
Prod Preparation (Compliance)
This status is managed internally by Jira Software
Prod Closer
This status is managed internally by Jira Software
Prod Sign-off & Validation (PO).
This status is managed internally by Jira Software
DEV VALIDATION & SIGN-OFF
This status is managed internally by Jira Software
Agree to Pursue
This status is managed internally by Jira Software
Requirement in Backlog/Closed
This status is managed internally by Jira Software
QA VALIDATION & SIGN-OFF
This status is managed internally by Jira Software
PROD VALIDATION & SIGN-OFF
This status is managed internally by Jira Software
PLA Publishing
This status is managed internally by Jira Software
Communication Creation
This status is managed internally by Jira Software
PLA Completed
This status is managed internally by Jira Software
PLA Submitted
This status is managed internally by Jira Software
EP&S Review
This status is managed internally by Jira Software
Daily Reminder
This status is managed internally by Jira Software
PSSM WIP
This status is managed internally by Jira Software
Selected for Sprint Review
This status is managed internally by Jira Software
Current Q
Q+1
Q+2
Q+3
Q+4
Q+5
Risk&Barrier
This status is managed internally by Jira Software
Templates
This status is managed internally by Jira Software
Get Quote
This status is managed internally by Jira Software
Testing - WIP
This status is managed internally by Jira Software
Approval
This status is managed internally by Jira Software
Document Test Scripts
This status is managed internally by Jira Software
Endorsement
This status is managed internally by Jira Software
E2E QA
Delivery
This status is managed internally by Jira Software
Ready to Work
This status is managed internally by Jira Software
Blocked/Onhold
This status is managed internally by Jira Software
Ideation
This status is managed internally by Jira Software
Proof of Concept
This status is managed internally by Jira Software
Ideas
This status is managed internally by Jira Software
PO Review/Demo
This status is managed internally by Jira Software
TSC Attention
Request Opened by Security Consulting Team Member
Internal Scoping/Response
Third-Party Engagement
Recovery
UAT in Progress
Data Classification Approval - In Progress
Data Classification - Done
QA approval - in progress
QA approval - done
PROD approval - done
QA approval -done
PROD approval - in progress
PROD approval -done
To Do(Technical Backlog)
This status is managed internally by Jira Software
Closure approval - in progress
Select Testing Date
Done on Training
This status is managed internally by Jira Software
Awaiting Knowledge Transfer
This status is managed internally by Jira Software
Change Control Approved
DoneDone
This status is managed internally by Jira Software
Hypothesis generation
Project start
Insights
Actions in progress
Rework
Scheduled Testing
Input Provided
Input Needed
Risk Accepted
GCMA/Approval
This status is managed internally by Jira Software
Admin Test Status
Testing in QA
This status is managed internally by Jira Software
Ready to Retrofit
REQUIREMENTS ANALYSIS
Refinement Ready
Refinement Complete
Level-of-Effort (LOE) Complete
BUILD COMPLETE
DEMO ACCEPTANCE
Risks & Barrier
This status is managed internally by Jira Software
Business Confirmation
This status is managed internally by Jira Software
Retire
This status is managed internally by Jira Software
Technical Analysis
This status is managed internally by Jira Software
Provision
This status is managed internally by Jira Software
PoC
This status is managed internally by Jira Software
Tools and scripts
This status is managed internally by Jira Software
DESIGN & REQUIREMENT
This status is managed internally by Jira Software
Pfizer Review
This status is managed internally by Jira Software
Already in Test Environment
This status is managed internally by Jira Software
Already in Prod Environment
This status is managed internally by Jira Software
Post Prod closure
This status is managed internally by Jira Software
Schedule Testing
Testing Scheduled
LOE Complete
Design & Estimate
This status is managed internally by Jira Software
In-Progress (Q)
This status is managed internally by Jira Software
Moved to Prod
This status is managed internally by Jira Software
Deferred/On-Hold
This status is managed internally by Jira Software
ER Approved
This status is managed internally by Jira Software
In-Progress (D)
This status is managed internally by Jira Software
PTMF Attention
Customer Feedback
This status is managed internally by Jira Software
Security Consulting
This status is managed internally by Jira Software
EPICS
This status is managed internally by Jira Software
Waiting for Customer Feedback
This status is managed internally by Jira Software
Pfizer Review & Approval
This status is managed internally by Jira Software
Build and Test
This status is managed internally by Jira Software
Wait HSE Engineering
This status is managed internally by Jira Software
waiting for HSE Engineering
This status is managed internally by Jira Software
Tech Testing
This status is managed internally by Jira Software
UI Build - In progress
This status is managed internally by Jira Software
Waiting on Customer – Complete
Ready for Stage Deployment
Pending Business Clarification
Pending Client Clarification
Retest Blocked
NEW / OPEN
DISCOVERY - In Process
DISCOVERY - Complete
DELIVERY - In Process
DELIVERY - Complete
Pending Digital Clarification
Outreach/Initial Scoping
This status is managed internally by Jira Software
Remediation Complete
This status is managed internally by Jira Software
Descoped/Out of Scope
This status is managed internally by Jira Software
Risk
This status is managed internally by Jira Software
Ready for Planning
Ready to be worked on
Waiting for Validation
In Progress- Off Track
In Progress- On Track
New JIRA Issues Created
This status is managed internally by Jira Software
OKRs
This status is managed internally by Jira Software
Carryover
This status is managed internally by Jira Software
PENDING VENDOR
Issue is with Product Vendor and awaiting fix or patch from vendor
In Q
This status is managed internally by Jira Software
Waiting for Priority
This status is managed internally by Jira Software
Waited -Complete
In Refinement
Blocked/ Waiting for Response
This status is managed internally by Jira Software
FL response due
Analysis-In Progress
This status is managed internally by Jira Software
Dev-In Progress
This status is managed internally by Jira Software
Dev-Done
This status is managed internally by Jira Software
Communication Created (SME)
This status is managed internally by Jira Software
PreProd
This status is managed internally by Jira Software
Content Factory/Producción
This status is managed internally by Jira Software
Dependency Tasks - CNF
This status is managed internally by Jira Software
RC2 Review
This status is managed internally by Jira Software
Final Delivery
This status is managed internally by Jira Software
Draft Content
This status is managed internally by Jira Software
Layout
This status is managed internally by Jira Software
SLA
This status is managed internally by Jira Software
TS1 Update
Requested
Evaluate
Excluded
QA Migrations
This status is managed internally by Jira Software
No Resolution
This status is managed internally by Jira Software
Approve Exception
Deployed to Stage- Ready for Formal Testing
Exception
Pending Code Review
Pending Test Deployment
Pending Stage Deployment
Pending Prod Release
Pending Info
Follow-up
This status is managed internally by Jira Software
On Queue (QC)
Assigned (QC)
QC In Progress
Initial QC Submitted
QC
This status is managed internally by Jira Software
Feasibility
R&D PARTNERSHIP CHALLENGE
Contract
Kick off
L&C Consultations
Privacy & Security
Contract Development
MAPP Policy Implementation/MAPP Nav
PO & Agreement Signature
Accept
Invoice
Followup
This status is managed internally by Jira Software
DEV team
This status is managed internally by Jira Software
Attention
This status is managed internally by Jira Software
Vendor
This status is managed internally by Jira Software
Repoter Input
This status is managed internally by Jira Software
QC Approved
In PROD
This status is managed internally by Jira Software
Deploy
This status is managed internally by Jira Software
Ready for Solutioning
This status is managed internally by Jira Software
Product Sign Off
This status is managed internally by Jira Software
Concluded
TO DO (3)
This status is managed internally by Jira Software
Epic
This status is managed internally by Jira Software
Pfizer Develop
This status is managed internally by Jira Software
Dev Review
This status is managed internally by Jira Software
Development Pfizer
This status is managed internally by Jira Software
Unassigned Projects
Backlog of Projects
BR / CR Received
Assigning DAR Team Lead
Defining Scope & Developing Plan / Milestones
Awaiting Kick-Off
In Progress - On Schedule
In Progress - Internal DAR Dependency
In Progress - Blockers
In Progress - Delayed
Under Reviews
This status is managed internally by Jira Software
Requests
This status is managed internally by Jira Software
not applicable
This status is managed internally by Jira Software
Digital Test Signed
This status is managed internally by Jira Software
Ready for DEV (M)
This status is managed internally by Jira Software
Storage Team
This status is managed internally by Jira Software
Basis Team
This status is managed internally by Jira Software
Xtra Column
This status is managed internally by Jira Software
Digital Testing
This status is managed internally by Jira Software
Waiting on Customer
This status is managed internally by Jira Software
Remediation In Progress
Risk Scoping
Waiting for Tenant
Under Planning
QA/UAT
This status is managed internally by Jira Software
Test Install Done
Test Verification Done
Soon
Pending PFE
This status is managed internally by Jira Software
Implementation in progress
This status is managed internally by Jira Software
Implementation done
This status is managed internally by Jira Software
Undergoing Analysis
This status is managed internally by Jira Software
QA ready
This status is managed internally by Jira Software
Waiting for Upstream/Input
This status is managed internally by Jira Software
Dev review and approve
This status is managed internally by Jira Software
Test in Draft
Test Review
Test in Progress
Access to data source - ongoin
This status is managed internally by Jira Software
Prioritization
This status is managed internally by Jira Software
Approvals / Review
This status is managed internally by Jira Software
DRY-RUN TESTING
FORMAL STAGE TESTING
READY FOR PROD DEPLOYMENT
Quality check in progress
This status is managed internally by Jira Software
Unassigned
This status is managed internally by Jira Software
Gathering info
This status is managed internally by Jira Software
Copywriting
This status is managed internally by Jira Software
Designing
This status is managed internally by Jira Software
Video editing
This status is managed internally by Jira Software
Audio editing
This status is managed internally by Jira Software
Report creation in progress
This status is managed internally by Jira Software
Markdown file creation
This status is managed internally by Jira Software
Ready to share
This status is managed internally by Jira Software
In QA Testing
This status is managed internally by Jira Software
Aprobado en GCMA
This status is managed internally by Jira Software
Deprecated
This status is managed internally by Jira Software
Tasks Completed
This status is managed internally by Jira Software
Need Customer input
This status is managed internally by Jira Software
To be scheduled
This status is managed internally by Jira Software
Defered
This status is managed internally by Jira Software
Pending Splunk
This status is managed internally by Jira Software
Pending Consoleworks
This status is managed internally by Jira Software
Publishing in progress
This status is managed internally by Jira Software
unmap
This status is managed internally by Jira Software
Testing (D)
Testing (Q)
Testing(D)
Ready to Deploy
This status is managed internally by Jira Software
Legal Review
Hub Alignment
Tech Analysis
Bug Fix
Functional Sign Off
UAT in Draft
UAT Review
UAT Ready
Invalid bug
Other statuses
This status is managed internally by Jira Software
Processing
This status is managed internally by Jira Software
Test In Stage
This status is managed internally by Jira Software
Pull Request Submitted
This status is managed internally by Jira Software
Done in Dev
This status is managed internally by Jira Software
Analysing
This status is managed internally by Jira Software
Defer
UAT In-Progress
IN Grooming
SIT COMPLET
Dev Complete (To be part of Release)
This status is managed internally by Jira Software
In Design Phase
This status is managed internally by Jira Software
SIT Complete
Solution Review
Architecture Review
MIRA
Go Live
Dev Setup
QA Readiness
QA Deployment
Production Readiness
Prod Readiness
04 - Review
Requirement in Progress
Requirement Complete
PREPARE FOR TESTING
SIT Test in Draft
SIT Test Review
SIT Test Ready
SIT Test in Progress
SIT Test Complete
Business Backlog
This status is managed internally by Jira Software
Ready To Go
This status is managed internally by Jira Software
Analysis In Progress
This status is managed internally by Jira Software
Non-Responsive
vendor has gone 60-days without response
Development Build in Progress
Development Build Complete
Development QA in Progress
Development QA Complete
Deployment in Progress
Feedback Provided
Epic - In Progress
This status is managed internally by Jira Software
Task - In Progress
This status is managed internally by Jira Software
Refining
This status is managed internally by Jira Software
Stories
This status is managed internally by Jira Software
Approved Idea Forum
This status is managed internally by Jira Software
Inspection
This status is managed internally by Jira Software
Handover
This status is managed internally by Jira Software
To Complete
This status is managed internally by Jira Software
To Achieve
This status is managed internally by Jira Software
Plan&Design
This status is managed internally by Jira Software
teste
This status is managed internally by Jira Software
In-UAT
This status is managed internally by Jira Software
Not approved/Cancel
This status is managed internally by Jira Software
WIP
This status is managed internally by Jira Software
Test Passed
Test Failed
DCO PMO
This status is managed internally by Jira Software
Deployment QA – Done
Deployment Prod – Done
RFC Planning
RFC Closure
Testing in UAT
This status is managed internally by Jira Software
Dev Dev Done
This status is managed internally by Jira Software
QA Done
This status is managed internally by Jira Software
Testing Done
This status is managed internally by Jira Software
Dev Ready
This status is managed internally by Jira Software
QA-Testing
This status is managed internally by Jira Software
Started
This status is managed internally by Jira Software
UAT Done
This status is managed internally by Jira Software
Selected for Action
This status is managed internally by Jira Software
Testing (Digital)
This status is managed internally by Jira Software
Digital Sign-Off
This status is managed internally by Jira Software
Accepted/Completed
This status is managed internally by Jira Software
Compliance Validation
This status is managed internally by Jira Software
Issue Open
This status is managed internally by Jira Software
Issue Closed
This status is managed internally by Jira Software
Handover to Ops
This status is managed internally by Jira Software
In Generatron
This status is managed internally by Jira Software
Ideate
This status is managed internally by Jira Software
Scurity Steps
This status is managed internally by Jira Software
IPRM
This status is managed internally by Jira Software
Supplier Security Assesment
This status is managed internally by Jira Software
Attack & Penetration
This status is managed internally by Jira Software
Pending on BAI
Pending on DevOps
On Queue
Draft Submitted
Dev (Validation & Sign-off)
This status is managed internally by Jira Software
QA Migration (Compliance)
This status is managed internally by Jira Software
QA (Validation & Sign-off)
This status is managed internally by Jira Software
Prod Migration (Compliance)
This status is managed internally by Jira Software
Prod (Validation & Sign-off)
This status is managed internally by Jira Software
Archive / Cleanup
This status is managed internally by Jira Software
Backlog / On Hold
This status is managed internally by Jira Software
Obsolete
Grooming Completed (Deferred)
In-Progress Dev
In-Progress Ops
Assign to Dev team
Assign to Ops team
PUBLISHED IN STAGE
This status is managed internally by Jira Software
Denied
Pre-deployment
Reassessment
Early Stages
This status is managed internally by Jira Software
Red
This status is managed internally by Jira Software
RCA in Progress
Retesting in DEV
Retest Passed in DEV
Ready for Retest in STAGE
Retest in STAGE in Progress
Ready for Client Approval
Story Approved
Superseded
Defect Raised
Defect Identified
Root Cause Analysis
QA Deployed
This status is managed internally by Jira Software
Done - Passed with exception
This status is managed internally by Jira Software
Prod Deployed
This status is managed internally by Jira Software
QA/Business Review
This status is managed internally by Jira Software
temp
This status is managed internally by Jira Software
Archive / Cleanup (New)
This status is managed internally by Jira Software
Ready For Next Month
This status is managed internally by Jira Software
Request-Waiting for Review
Request-Review in Progress
Request-Scoping
Request-Denied
Request-Scope Approved
Request-Prioritized
Request-Under Design
Request-Ready for Development
Request-Cancelled
Prod Ready
Ready for PRD
This status is managed internally by Jira Software
Post PRD Testing
This status is managed internally by Jira Software
PRE-QA approvals
This status is managed internally by Jira Software
Testing on Stage
This status is managed internally by Jira Software
Awaiting Customer Support
Stage Code Review
This status is managed internally by Jira Software
Vistech Design Review
This status is managed internally by Jira Software
Move to Q submitted
This status is managed internally by Jira Software
Move to Q approved
This status is managed internally by Jira Software
Move to Prod submitted
This status is managed internally by Jira Software
Move to Prod approved
This status is managed internally by Jira Software
Waiting for Review
This status is managed internally by Jira Software
PRD Deployment
This status is managed internally by Jira Software
False Positive
Project Qualification (TCS/Pfizer)
SoW Draft In Progress (TCS)
SoW Draft Under Review (TCS/Pfizer)
SoW Sign Off (Pfizer)
SoW Signature In Progress (TCS)
SoW Signature In Progress (Pfizer)
PO Release (Pfizer)
Project Implementation (TCS)
Pre Implementation Checks (TCS)
Implementation (TCS)
Post Implementation Checks (TCS)
UAT Testing (Pfizer) - Implementation (TCS)
Project Closure Sign Off (Pfizer)
Project Feedback - Feedback Form (Pfizer)
Development Ready
This status is managed internally by Jira Software
Archived
Pending RCA
Prioritized
This status is managed internally by Jira Software
Under Design
This status is managed internally by Jira Software
Analysis Priority
This status is managed internally by Jira Software
Pending User
This status is managed internally by Jira Software
Dry Run Testing in Progress
Deployed to Production
ACD Ticket Onboarded
This status is managed internally by Jira Software
CDM number release needed
This status is managed internally by Jira Software
Scope Approved
This status is managed internally by Jira Software
Design To Do
Design Done
Pushed to Test
Assign to L3
This status is managed internally by Jira Software
L1/L2 in progress
This status is managed internally by Jira Software
L1/L2 Done
This status is managed internally by Jira Software
Approved for QA
Approved for QA
Team Work
This status is managed internally by Jira Software
Blocked/Wait
This status is managed internally by Jira Software
Pre-scoping
This status is managed internally by Jira Software
HISTORICAL
This status is managed internally by Jira Software
Deploy to US-UAT Env
Change Approved
Post Deployment Verification
This status is managed internally by Jira Software
Issue
This status is managed internally by Jira Software
Schedule Test Run
Feasibility in Progress
This status is managed internally by Jira Software
Under Threshold
This status is managed internally by Jira Software
Over Threshold
This status is managed internally by Jira Software
LRI Closed
This status is managed internally by Jira Software
LRI Open
Risk Open
Risk Closed
Adjustments from GCMA
Waiting for GCMA
Resubmit to GCMA
Ready to start GCMA
In test (Informal)
This status is managed internally by Jira Software
Assigned-WIP
Fixed-In Progress
Return-Input Required
WAITING RESPONSE / BLOCKED
This status is managed internally by Jira Software
PROJECT INITIATION
This status is managed internally by Jira Software
Waiting for Response
This status is managed internally by Jira Software
Sign Off
This status is managed internally by Jira Software
Implemented
This status is managed internally by Jira Software
pending action
FastTrack Design
This status is managed internally by Jira Software
Compliance (PR)
This status is managed internally by Jira Software
Cancelled or Absorbed
This status is managed internally by Jira Software
DROPPED
This is track all the requests which were dropped
Approved Ideas
This status is managed internally by Jira Software
Release candidate
This status is managed internally by Jira Software
QA Open
This status is managed internally by Jira Software
Due Diligence Completed
Approved During Governance
Denied During Governance
Done / Design Completed
TST
True Positive (No Changes)
True Positive (Severity Recast)
True Positive (Scan Template Modification)
Discovery
Requirements Definition
Delivered
Automate
Simplify
Measure
Funding Approved on Hold Queue
Business Funding Approval
CRB Triage
Pending Project Queue
Create/Finalize PO
Phase II Release I Post Prod
This status is managed internally by Jira Software
Phase II Release II Post Prod
This status is managed internally by Jira Software
Tested in dev
This status is managed internally by Jira Software
Exclusion
Priority - Order
This status is managed internally by Jira Software
QA TO DO
This status is managed internally by Jira Software
BAU Groomed
This status is managed internally by Jira Software
Governance Groomed
This status is managed internally by Jira Software
Technical Assessment
This status is managed internally by Jira Software
Developement
This status is managed internally by Jira Software
Atlas R15
This status is managed internally by Jira Software
BAU Priority
This status is managed internally by Jira Software
Governance TODO
This status is managed internally by Jira Software
BAU TODO
This status is managed internally by Jira Software
Requirements - R15
This status is managed internally by Jira Software
QA Acceptance
This status is managed internally by Jira Software
Gathering Requirements
This status is managed internally by Jira Software
DF & QAE Priority
This status is managed internally by Jira Software
DF & QAE Groomed
This status is managed internally by Jira Software
Current Sprint (WIP)
This status is managed internally by Jira Software
In Product Roadmap
This status is managed internally by Jira Software
SIT In-Progress
This status is managed internally by Jira Software
BRD Placeholder
This status is managed internally by Jira Software
Reqts Analysis Completed
Reqts Analysis Initiated
Governance Priority
This status is managed internally by Jira Software
Assessing Impact
This status is managed internally by Jira Software
Assigned to MDM Team
This status is managed internally by Jira Software
Issue/Query Resolved
This status is managed internally by Jira Software
Retest Completed
This status is managed internally by Jira Software
Assigned to HUB Team
This status is managed internally by Jira Software
Assigned to CM Team
This status is managed internally by Jira Software
Assigned to DSR Team
This status is managed internally by Jira Software
Assigned to Downstream Systems
This status is managed internally by Jira Software
Pending with Source (Veeva)
This status is managed internally by Jira Software
NSA In Progress
COMPLETE IN NSA, UNDER ENTERPRISE REVIEW
COMPLETE IN ENTERPRISE
SIT and UAT
This status is managed internally by Jira Software
Sprint Testing in Progress
Sprint Testing Completed
Formal Verification In Progress in qTest
Formal Verification Completed in qTest
PO Approved
PO Rejected
Hiatus
This status is managed internally by Jira Software
Sept
This status is managed internally by Jira Software
SAP DI
This status is managed internally by Jira Software

Resolutions

An issue can be resolved in many ways, only one of them being "Fixed". The defined resolutions are listed below. You can add more in the administration section.

On Hold
This issue may get reopened but it doesn't need to be addressed immediately.
Cancelled
This is not an issue any longer
Done
Work has been completed on this issue.
Won't Do
This issue won't be actioned.
Duplicate
The problem is a duplicate of an existing issue.
Cannot Reproduce
All attempts at reproducing this issue failed, or not enough information was available to reproduce the issue. Reading the code produces no clues as to why this behavior would occur. If more information appears later, please reopen the issue.
Not Required
The issue is no longer significant
Fixed
A fix for this issue is checked into the tree and tested.
Won't Fix
The problem described is an issue which will never be fixed.
Incomplete
The problem is not completely described.
Deployed
Fixed / Completed and deployed to server
Completed
Task complete
Not Resolved
Temporary resolution status to remove the "unresolved" someone added by mistake. This is a JIRA default and causes all sorts of issues if it's defined manually. [HF]
Rejected
Deferred
Failed
Transferred
Closed
Closed
Deferred to Roadmap
Deployment In Progress
Deployment Ready
In Progress
More Info Needed
New
Non-Issue
Ready For Testing
As Designed
This is the way things were designed
New Feature
This needs to be a new feature and is not a bug
Re-Opened
Issue is re-opened
Restored
Work has been Restored for this issue.
Declined
This issue was not approved.
Known Error
Required for Problem management
Root Cause Analysis
Required for Problem management
Misclassification
Required for Problem management
Canceled
Canceled
Resolved
Resolved
Implemented on DEV
Implemented on DEV
Implemented on STG
Implemented on STG
Implemented on PROD
Implemented on PROD
Closed by Customer
Ticket was closed by customer
Closed - No Response
Ticket closed automatically due to no customer response to info request.
Not Seen in 30 days
The issue has not been seen within the last 30 days of vulnerability scans
Not Seen in 60 days
The issue has not been seen within the last 60 days of vulnerability scans
Not Seen in 90 days
The issue has not been seen within the last 90 days of vulnerability scans
Terminate Development
Stage and WRD Project Status
Hardware failure
Software failure
Retired
Re-Open
Back To Reporter
Unresolved
Unresolved
In Test
Not Seen in 180 days
The issue has not been seen within the last 180 days of vulnerability scans
Function As designed
This issue won't be actioned.
Complete
Blocked
Accepted
This resolution value is added for ADLC workflow
Assigned
Out of Scope
The issue is not in scope.
Invalid
Invalid
Missed Requirements
Open
In Review
Solved
For PG project ( raised by (norbert.siwiec@pfizer.com)
Dev Done
Ready for Release